Waterloo Metro Quarter Development Southern Precinct

Waterloo, NSW

Project Overview

Absolute Fire Solution served as an independent passive fire consultant for the Waterloo Metro Quarter Development, a significant urban project in NSW.

Third Party Independent Consultant

Waterloo Metro Quarter Development Southern Precinct

CLIENT:

John Holland

LOCATION:

Waterloo, NSW

PROJECT DURATION:

12 months

SERVICES PROVIDED:

Third Party Independent Passive Fire Consultant and Inspector

Project Overview

Absolute Fire Solution served as an independent passive fire consultant for the Waterloo Metro Quarter Development, a significant urban project in NSW.

SCOPE OF WORK

  • Reviewed consultant and subcontractor passive fire matrix to demonstrate the required fire rating locations, proposed products, and relevant data sheets.
  • Provided inspection registers, reports, and marked-up drawings.
  • Participated in value management/engineering and risk management workshops.
  • At Practical Completion, provided a third-party inspection certificate confirming that the fire-rated penetrations were protected per AS1530.4 and AS4072.1, complying with C3.15 of the NCC during the construction stage.

Outcome

  • Ongoing project.
  • The Fire matrix includes all potential Passive Fire Protection systems with the relevant test and assessment reports, submitted early in the project to the Private Certifier.
  • Assisted the client in substituting Passive Fire Protection systems when design changes occurred during construction.
  • Prepared and submitted inspection registers, reports with photos, and marked-up drawings for required areas before installing partition walls and ceilings.