Liverpool Civic Placec

Liverpool, NSW

Project Overview

Absolute Fire Solution was contracted by Goldline and Climatech to complete passive fire protection services for Liverpool Civic Place, a significant community infrastructure project in the Liverpool CBD. The scope of work included extensive fire seal installations for both electrical and mechanical penetrations, along with comprehensive fire damper inspections.

Duis aute irure in reprehenderit

Liverpool Civic Placec

CLIENT:

Goldline, Climatech

LOCATION:

Liverpool, NSW

PROJECT DURATION:

6 months

SERVICES PROVIDED:

Fire sealing for electrical penetrations, fire seal installation for mechanical penetrations, and fire damper inspection and certification

Project Overview

Absolute Fire Solution was contracted by Goldline and Climatech to complete passive fire protection services for Liverpool Civic Place, a significant community infrastructure project in the Liverpool CBD. The scope of work included extensive fire seal installations for both electrical and mechanical penetrations, along with comprehensive fire damper inspections.

SCOPE OF WORK

  • Collaborated with Goldline to identify and fire-seal electrical service penetrations across the facility, ensuring compliance with AS1530.4 and AS4072.1 requirements, meeting the necessary Fire Resistance Levels (FRLs).
  • Collaborated with Climatech to conduct fire seal installations for mechanical penetrations, focusing on maintaining fire integrity within mechanical systems per NCC and AS Standards.
  • Performed thorough fire damper inspections per the relevant Australian Standards, verifying proper installation and operation, and certifying fire damper compliance.
  • Documented all fire seal installations and fire damper inspections through detailed reports, including a Passive Fire Register, installation certificates, photographic evidence, and marked-up drawings.

Outcome

  • All fire seal installations and fire damper inspections were successfully completed, fulfilling Goldline’s and Climatech’s requirements while adhering to stringent compliance standards.
  • The project was completed on schedule, with Absolute Fire Solution providing final certifications, enabling Liverpool Civic Place to achieve full compliance with AS Standards and NCC requirements.
  • The collaborative effort resulted in a safe and compliant infrastructure, contributing to the successful completion of this landmark project for the Liverpool community.