East Sydney Private Hospital Level 6 Fitout

Sydney, NSW

Project Overview

Absolute Fire Solution has been engaged as a third-party consultant for the Level 6 fitout of East Sydney Private Hospital by FDC Construction and Fitout. The project focused on comprehensive fire sealing and fire damper inspections to ensure compliance with Australian Standards and safety regulations in a healthcare setting.

Third Party Independent Consultant

East Sydney Private Hospital Level 6 Fitout

CLIENT:

FDC Construction and Fitout

LOCATION:

Sydney, NSW

PROJECT DURATION:

3 months

SERVICES PROVIDED:

Third-party consulting for fire seal installations and fire damper inspections

Project Overview

Absolute Fire Solution has been engaged as a third-party consultant for the Level 6 fitout of East Sydney Private Hospital by FDC Construction and Fitout. The project focused on comprehensive fire sealing and fire damper inspections to ensure compliance with Australian Standards and safety regulations in a healthcare setting.

SCOPE OF WORK

  • Conducted a thorough review of the fitout plans and existing services to identify areas requiring fire seal installations and fire damper inspections.
  • Provided consultation on passive fire protection solutions, ensuring that fire seals were installed correctly to maintain the fire integrity of the structure.
  • Collaborated closely with FDC throughout the construction process, addressing any fire-related inquiries and assisting in troubleshooting issues as they arose.
  • Inspected and certified fire seal installations and fire dampers to ensure compliance with relevant AS standards and National Construction Code (NCC) requirements.


Challenges:

Healthcare Environment:

  • The hospital environment required meticulous attention to detail to ensure that fire protection measures did not interfere with operational areas or patient care.


Tight Timelines:

  • Coordination with other trades and adhering to a tight construction schedule necessitated effective communication and collaboration with the FDC team to meet project deadlines.

Outcome

  • Successfully provided comprehensive fire seal consulting and fire damper inspection services for the Level 6 fitout, contributing to a safe and compliant hospital environment.
  • Completed the project within three months, ensuring all fire seals and dampers met the necessary standards, thereby enhancing the hospital’s fire safety measures.
  • Continued collaboration with FDC Construction and Fitout throughout the project promoted a proactive approach to fire safety compliance and risk management.