ALLIANZ STADIUM – SYDNEY CBD

Sydney CBD, NSW

Project Overview

CBRE | GWS Pacific contracted Absolute Fire Solution to conduct the annual inspection and endorse the relevant fire safety measures (Fire seal, Fire/Smoke dampers and lightweight construction) for Allianz Stadium.

Annual Fire Safety Statement

ALLIANZ STADIUM – SYDNEY CBD

CLIENT:

CBRE | GWS Pacific

LOCATION:

Sydney CBD, NSW

PROJECT DURATION:

3 months

SERVICES PROVIDED:

Compliance Audits for the Annual Fire Safety Statement as per the relevant AS Standards and NCC requirements.

Project Overview

CBRE | GWS Pacific contracted Absolute Fire Solution to conduct the annual inspection and endorse the relevant fire safety measures (Fire seal, Fire/Smoke dampers and lightweight construction) for Allianz Stadium.

SCOPE OF WORK

  • Conducted the annual inspection per the relevant AS standards and NCC requirements listed on the Annual Fire Safety Statement.
  • Assisted the client in site meetings with the original contractor to clarify non-compliant items and monitor the rectification progress.
  • Proposed rectification methodologies and relevant costs to address outstanding non-compliant items.
  • Prepared and submitted the final inspection report, endorsing relevant fire safety measures listed on the Annual Fire Safety Statement.

Outcome

  • Identified all existing non-compliant items per the relevant AS Standards and NCC requirements.
  • Successfully clarified and allocated non-compliant items to the responsible subcontractors within the Defect Liability Period.
  • Closed out outstanding non-compliant items, allowing the AFSS to be endorsed without delay.